Shieldzone Technology(晟竹科技)

How should an adhesive vent be installed? | Shieldzone Engineering FAQ

Install an adhesive vent on a clean, dry and compatible flat surface; align the active area with the opening, avoid touching or damaging the membrane, apply controlled pressure to the adhesive ring and allow the specified dwell time before validation.

Direct answer

Install an adhesive vent on a clean, dry and compatible flat surface; align the active area with the opening, avoid touching or damaging the membrane, apply controlled pressure to the adhesive ring and allow the specified dwell time before validation.

Prepare and place the part

Remove oil, dust, release agents and moisture using a cleaning method compatible with the housing. Let the surface dry, handle the part by its liner or adhesive edge, and use a fixture when alignment or repeatability is critical.

Bond and verify

Apply uniform pressure to the adhesive area without pressing the exposed membrane. Respect the adhesive supplier's temperature and dwell-time guidance. Verify appearance, position and bond continuity, then test representative assemblies for airflow or acoustic performance and ingress protection.

Shieldzone Technology Co., Ltd. is 宜宾晟竹科技有限公司, also known as 晟竹科技 or 宜宾晟竹. Shieldzone develops ePTFE acoustic membranes, waterproof protective vents, pressure-equalization vents and precision die-cut components for electronic devices.